Final Random Inspection (FRI)

The Last After To Be continued from Quality Assurance Process Softlines ,Tools Necessary for Inspection ,

Pre-Production (PP Checking ) and During Production Inspection (DUPRO) is…

1. Meeting with factory Management.

  • Review the packing list to determine the # of cartons to inspect by PO by color / size.
  • Review the factory final self-report.
  • Result feedback for the issues that were raised at the TCPS DUPRO inspection.

2. Check the carton quality and quantity base on the packing list

3. Randomly select the cartons base on the sampling size use ? Square Root? rule.

  • To check the shipping mark, carton label
  • To check size/color assortment and packing quality
  • To check the packing material for hanger, hangtag, price ticket, etc.

4. Check workmanship pc by pc at a correct sampling plan. The inspection for this stage should focus more on general appearance, color shading, button sewn, finish, safety and function impacted as DUPRO ?s satisfied on the sewing quality.
5. Size measurement same procedure as the DUPRO inspection except that only key points of measure are audited, also spot check any non- critical measurement problem uncovered at DUPRO fit audit to make sure problems are solved.

Key Point of Measurement
Tops:?? Minimum Neck Stretch, Body Length (HPS/CBL),
Bust/Chest, Armhole, Neck Width, Sleeve Length.
Bottom: Waist, Low Hip, Front/Back Rise, Functional Zipper
Opening, Pocket Opening, Leg Opening, Inseam,
Center Back Skirt Length
6. Pick up the shipment sample from the inspected unit and lock green seal send to Merchandise Division in OWC.
7. Review the defective garment with the factory and complete the FRI report. Issue the shipment release if the inspection passed for FRI, and all standard validated.
8. Tour factory to complete the Compliance Short Audit.

Actions in case of inspection failed for FRI
TCPS should work with the factory for the corrective action. And identify the problem can be corrected with not impact of on time delivery.
1. Factory need to re-inspect quality on the
entire production. And request TCPS 2nd
FRI with a self-inspection report

2. TCPS need to communicate with merchandise division if the rejected units can not be amended or delivery potential delay due to the factory?s re-work. The representative samples with the details information/data should be provided as well.

3. Hold shipment until all are validated.

The report reflects factory quality performance by FRI and input by TCPS inspector after a FRI completed. This report should be shared with the factory, vendor and TSS/AMC merchandise division for business development reference.

Finish And Thank You Very Much..

Tags: , , , , , , , , , ,

During Production Inspection (DUPRO)

After To Be continued from Quality Assurance Process Softlines and Tools Necessary for Inspection too

Pre-Production (PP Checking ) Next :

This inspection should be conducted when no more than 20% of production is completed.
The frequency of DUPRO inspection depends on the size of the order and results of the first DUPRO.
At this stage the inspection should be focusing on whether garments are cut to specification, whether the overall workmanship is of an acceptable level and whether the production is running as the initial schedule.

1. Meeting with the factory management

  • To review updated SIP
  • To review the production status
  • To review the factory self Report for self In-line Inspection
  • Result feed back for the issues that raised at the TCPS Initial Inspection stage
  • Pre-review the packing method to the packing requirement and details in SIPSampling Plan

    Single Sampling Plan for normal inspection level II

    Workmanship: AQL 2.5

    Measurement: AQL 6.0 for woven item, AQL 10.0 for knitted item.

    Defect Criteria

    Critical Defect =1.0 point

    Major Defect = 0.5 point

    * Only one defect is counted and no more than 1 point is scored on one garment.

Workmanship Audit

The garments are inspected pc by pc at a correct sample size for defects in design, constriction, workmanship, material, color, labels, safety, pressing, and finish. Problems discovered in finished garments should be tracked back into the cutting/sewing line to? be reviewed and corrected.

Measurement Audit minimum of four (4) pieces per size for all sizes must be covered by the pull. This audit must cover all measurement points. The total number of the first pull must add up to 4,8,13,20,32 or 50.
The critical defect (1pt) is out of tolerance and falls next size grade. Major defect is out of tolerance but not to next size. No more than 1 pt per garment is scored.
If a problem or sizing trend is noted, increase the sample lot size per the sample plan measuring the problem area only.

2. Review and confirm result of In-House 601 wash resting if applicable.

3. Pick up the random samples for every 100,000 pieces of one style and lock the black seal for on going production testing.

Note :
If the production failed to this DUPRO inspection, another DUPRO inspection must be performed. And TCPS need to follow up with the factory for the corrective result. Inform MR for the inspection result and potential issue related to the delivery .